Generally Approved TL-3 Units

The following treatment units have been field tested in accordance with 12VAC5-613-70 and GMP 2016-03 (or predecessor) and are generally approved for use as Treatment Level 3 wastewater treatment units.  Below are the approval letter, report of field testing, technical drawings and O&M manuals for the units.  Designers are reminded that they must provide a site specific O&M manual covering ALL components of the system to comply with 12 VAC 5-613-150 for each installation. The site specific O&M manual for each system will be on file at the local health department and will provide O&M guidance that complies with the Regulations for Alternative Onsite Sewage Systems.


Brand Name

Manufacturer

Cut-sheets/Drawings

Letters/Data

O&M & Design Manuals

Orenco Systems, Inc.

AX20 Pump Discharge Option 1.pdf

Advantex TL3 Approval June 21, 2019

AdvanTex OM advanced service and troubleshooting.pdf

AX20 Pump Discharge Option 2.pdf

Advantex Data Set with Statistics

Advantex Submittal

AdvanTex OM start-up and routine maint.pdf

AX20 Single Pod Single Tank.pdf

PA Final Report – Orenco

VA Test Report

AX20 Design Criteria (nda-atx-2-1)

AXRT Design Criteria VA (nda-atx-axrt-1-va)

AX20 Single Pod Two Tank.pdf

Orenco Variance – signed AX20 install manual

AXRT install manual

AX20 Two Pod Two Tank.pdf

aim-om-atx-sup-1

UV – AXUV -OM

AX20RT Configurations

AX25-RT Drawing w Gravity Discharge (NDW-ATX-RT-VA-131)

AX25-RT Drawing w Pump Discharge (NDW-ATX-RT-VA-101)

AX25-RT Drawing w UV + Pump Discharge (NDW-ATX-RT-VA-9)

Ecological Tanks, Inc.

AS500 EZ TOPwithdischargefilter1.pdf

aquasafe engineering cert

Design Manual for Residential & Commercial Applications

VA Agreement

AquaSafeInstallationManual
Old Dominion Engineering letter AquaSafe OwnersManual

NPDES Sampling…Ohio

9.23.13 Approval Letter

1.31.18 Approval Letter      (AS1000)

1.18.18 Request for Approval (AS1000)

Anua International

Drawings:

  1. Anua_Quanics-ATS-540-BC-N-TL3-061020
  2. Anua_Quanics-ATS-1060-BC-N-TL3-061020
  3. Anua_Quanics-BioCoir_DWG_NS500_80-20_VA_TL3-NS500_80-20-061120
  4. Anua_Quanics-BioCoir_DWG_NS750_80-20_VA_TL3-NS750_80-20-061020
  5. Anua_Quanics-BioCoir_DWG_NS1000_80-20_VA_TL3-NS500_80-20-061020

Engineer’s Product Certification Statement and Evaluation.pdf

Anua-Quanics_PressRelease_060519

IM Series Manuals:

  1. Anua_Quanics-BioCoir-VA_IM_TSS-LR_053020
  2. Anua_Quanics-BioCoir-VA_IM_ResDesign-LR_053020
  3. Anua_Quanics-BioCoir-VA_IM_Maintain-LR_053020
  4. Anua_Quanics-BioCoir-VA_IM_Installation-LR_053020

Manufacturer Agreement.pdf

Biocoir Transfer to Anua – Review Memo 05 2020

Biocoir_Transfer to Anua Approval_letter_05 2020

Updated Approval_BioCoir 07 13 2022

NS Series Manuals:

  1. Anua_Quanics-BioCoir-VA_NS_TSS-LR_053020
  2. Anua_Quanics-BioCoir-VA_NS_ResDesign-LR_053020
  3. Anua_Quanics-BioCoir-VA_NS_Maintain-LR_053020
  4. Anua_Quanics-BioCoir-VA_NS_Installation-LR_053020

 

Bio-COIR Final Report

Clearstream Wastewater Systems, Inc. Approval Letter

Letter DA and DAC

Clearstream Model Update Letter 10 27 2021

 

Clearstream D Unit TL3 Data Analysis (1)

Model D OM all configurations 2-24-2016
PUMP SIZING DESIGN MANUAL FOR CLEARSTREAM D SERIES.1

Clearstream DACD – Approved March 7th, 2024
Clearstream Wastewater Systems, Inc. Signed approval letter 03.07.24 Clearstream Request for 1200DACD (002)

Correspondence.2023.03.02.Clearstream Model 1200DACD Virginia (003)

DA Operation-Install-Maint rev1 2-28-2023 (1) (002)

Premier Tech

Ecoflo Approval + Review Memo

PremierTechCorrection_Received Mar 2019

Operation and Maintenance VA 20181207

Ecoflo-Polyethylene_Technical-Data-Sheet

Ecoflo-Concrete_Technical-Data-Sheet

Ecoflo-Fiberglass_Technical-Data-Sheet

Ecoflo TL3 approval reapplication 20181128

EZ Treat Corporation

Tank Sizing

MOUA Approval Memo

Approval Letter

EZ Treat 750 Approval 09 16 2019

EZ Treat O&M Manual

E-Z 750 POD

Product Brochure: MicroFAST®

Bio-Microbics

Approval letter

Biomicrobics-Final-Report FAST-Installation-Manual-0.5-3.0-July-1-2022

Technical Plans & Specs


MicroFAST Data Analysis Oct 2017 – Aug 2018 FAST-Owners-Manual-August-10-2022
MicroFast-VA-Tank-Sizes MicroFAST VDH 2018-02-05 Spreadsheet 23 sites w dl fixed FAST-Service-Manual-July-1-2022
IM-1530 + MIcroFAST ATUs_022221

IM-1530 Compartment Volume

Installation Guidelines for FAST® into IM-1530-Version 2.2

Norweco Singulair 960 with HydroKinetic Biofilm Reactor Approved April 23, 2020
Norweco PC-5-1050 Singulair Green with HKBFR 500-600 GPD

PC-5-1051 Singulair with HKBFR 500-600 GPD

PC-5-6156 Singulair with HKBFR and Pump Tank 500 – 600 GPD

PC51149 Sing 1000 2 HKBFR 1000 GPD

PC56154 Sing 600 BFR Combo 500-600 GPD

PC56155 Sing 800 BFR Combo 750 GPD

PC56159 Sing 600 BFR Combo Basic 500-600 GPD

PC56162 500-600 GPD w UV

PC57153 SG w BFR Combo 600 GPD

Norweco Approval Letter 04 23 2020

NWE250119 VDH_Final_Report Rev2

Hydro-Kinetic Bio-Film Reactor Service Instructions

Singulair O&M Manual

Anua International

Anua_Pflo_DWG_AssembledModuleDetail_060112 Anua_Pflo_DWG_ModuleGridDetail_060112 Anua_Pflo_DWG_SampleChamberDetail_060112 Anua_Pflo_DWG_TypeA&BInstallations_060112 Anua Puraflo TL3 Renewal 04 15 2020

Puraflo Data and Statistical Analysis via VDH GMP 2016-03

Anua_GR_VA_PurafloTL-3Package_031820

Anua Puraflo TL-3 PE Certification Letter – 2019-08-26

Anua O&M PE Certification Letter – 2019-08-26

 

Anua_Pflo_Owner-LR_101019

Anua_Pflo_Maintain-LR_101019

Anua_Pflo_Reference-LR_101019

Anua_Pflo_Install-Inspect_Chklist-LR_012518

Anua_Pflo_TypeBPiping-LR_012518

Puraflo Design Spreadsheet

Anua Treatment System Tracking Sheet
REPLACING PEAT WITH COIR FIBER DOES NOT MAINTAIN  TL3 GENERAL APPROVAL FOR PURAFLO

 

Commonwealth of Virginia Mail – Onsite Sewage_ Replacement of Peat Media in Puraflo with Coir Media

VDH Review Memo 11 12 2021

Anua_GR_VA_SpentPeat_Coir_Correlation_PEseal_211005