Online Services | Commonwealth Sites | Help | Governor

Protecting You and Your Environment Virginia Department of Health
Home | VDH Programs | Find It! A-Z Index | Newsroom | Local Health Districts

Procedural Regulations

Article 1 - Definitions and Terms

12 VAC 5-581-10 Definitions

12 VAC 5-581-20 Terms

Article 2 - Procedures

12 VAC 5-581-30 Compliance with the APA

12 VAC 5-581-40 Extent of Regulations

A. Powers and Procedures of Regulations
B. Establishment
C. Effective Date
D. Exception

12 VAC 5-581-50 Enforcement

A. Notice
B. Orders
C. Compliance
D. Not Exclusive

12 VAC 5-581-60 Emergency Orders

12 VAC 5-581-70 Variances

A. Requirements
B. Application
C. Consideration
D. Disposition
E. Posting

12 VAC 5-581-80 Types of Hearings

A. Informal Conference
B. Hearing

12 VAC 5-581-90 Informal Conference

12 VAC 5-581-100 Hearing

12 VAC 5-581-110 Permits

A. Individual Home Discharges
B. Small Sewerage Systems and Treatment Works

12 VAC 5-581-120 Reliability Classification

12 VAC 5-581-130 Permit Procedures

12 VAC 5-581-140 Application

12 VAC 5-581-150 Preliminary Engineering Conference

12 VAC 5-581-160 Preliminary Engineering Proposal

12 VAC 5-581-170 Construction Drawings (Plans)

12 VAC 5-581-180 Specifications

12 VAC 5-581-190 Operation and Maintenance Manual

12 VAC 5-581-200 Sludge Management Plans

12 VAC 5-581-210 Formal Requirements for Submission of Engineering Data

12 VAC 5-581-220 Processing of Plans, Specifications and Other Engineering Documents

12 VAC 5-581-230 Construction Permit

A. Issuance
B. Revisions
C. Completion of Construction

1. Statement
2. Inspection
3. Closure Plan

12 VAC 5-581-240 Operation Permit

A. Final Permit
B. Conditional Permit
C. Interim Permit

12 VAC 5-581-250 Permit Modifications or Revocation Actions

A. Amendment or Reissuance
B. Revocation or Suspension

1. Reasons for Action
2. Procedure for Action
3. Right to Hearing

12 VAC 5-581-260 Nonconventional Methods, Processes or Equipment

A. Provisional Permit
B. Assurance Resources
C. Performance Reliability Testing
D. Construction Permit
E. Provisional Operation Permit F. Final Operation Permit

12 VAC 5-581-270 Nondischarging Treatment Works

A. Application
B. Operational Plan

12 VAC 5-581-280 General Permit for Sewerage Systems

A. Local Plans and Specifications
B. Owner Plan
C. Extensions

12 VAC 5-581-290 Compliance with Part II (Operational Regulations)

A. Permit Issuance
B. Monitoring

12 VAC 5-581-300 Compliance with Part III (Manual of Practice)

A. Additional Standards
B. Substantial Compliance
C. Exceptions

12 VAC 5-581-310 Sewerage Collection and Treatment Advisory Committee

A. Organizations
B. Terms
C. Purpose


Last Updated: 01-31-2007

Printable Version

E-mail This Page