Construction Permits

Construction Permit

12VAC5-590-200 of the Waterworks Regulations requires an owner or authorized agent to submit an application for a permit from the Virginia Department of Health (VDH) to construct, expand, or modify a waterworks.

The following types of projects do not require a construction permit, if you have any questions about applicability, please contact ODWConstructionPermits@vdh.virginia.gov:

  • Waterline projects approved by a locality with an ODW General Permit.
  • Waterline projects serving less than 15 connections and consisting of pipes less than or equal to 8 inches in diameter and a design demand of less than 6,000 gallons per day.
  • Replacement-in-kind and maintenance - Some examples include, replacing a 1,000 gallon pressure tank with another 1,000 gallon pressure tank with  the same dimensions and appurtenances, replacing a chemical metering pump with a chemical metering pump of equal or greater capacity, or replacing a 2-inch water main with a 2-inch water main in the same street. Maintenance could include painting a storage tank or rebuilding a water service pump. Replacement and maintenance items must comply with all requirements of Part III of the Regulations.
  • Projects not impacting the withdrawal, treatment, conveyance, or storage of drinking water, including water plant laboratories, or emergency generators.
Last Updated: October 31, 2025